The main production indicators of JSC "Uzbekenergo" for the 1st quarter of 2018

Mainfactors

Unit

measurements

1 quarter

2018

I.

Electricpowergeneration:

bnkWh


1.

in the Republic of Uzbekistan

bnkWh

16,7

1.1.

for TPP and TPP of JSC "Uzbekenergo"

bnkWh

15,5

II.

Specificfuelconsumption:

millionGcal



On the released electric power

bnkWh

355,70


On the released heat energy

kg / Gcal

179,89

III.

Heatenergyrelease

millionGcal

2,61

IV

Exportofelectricity

bnkWh

0,509

V

Total mastered by investment projects

billionsoums

1021,06


including:

- ownfunds

billionsoums

77,34


- foreign loans under the guarantee of the Government of the Republic of Uzbekistan

billionsoums

932,33


Bankcommercialloans

billionsoums

11,39




BRIEF RESULTS OF THE WORK OF JSC UZBEKENERGO FOR THE I QUARTER OF 2018

The JSC "Uzbekenergo" takes the necessary measures for the sustainable operation of energy enterprises. In order to achieve sustainable rates of economic growth and stable operation of the power industry, JSC Uzbekenergo developed a set of measures to reduce production costs and reduce the cost of manufactured products, as well as planned for production.

The decrease in the cost of production for the first quarter of this year was 100.8%.

Enterprises of the joint-stock company ensure fulfillment of the forecast parameters of production activity. According to the results of the first quarter of 2018, the volume of commodity output in the industry was 108.1%.The delivery of electric power in the volume of 15.5 billion kWh. Thermal energy in the volume of 2.61 million Gcal was released.

The forecast indicators for the export of products and services were fulfilled by 105.6%. Localized products for a total of 315.9 million soums were produced.

Provided services for maintenance of networks and carrying out design and survey, construction and installation works.

In accordance with the resolution of the President of the Republic of Uzbekistan dated from 03.02.2018. №. RP-3507 "On approval of the lists of investment and infrastructure projects for 2018", JSC "Uzbekenergo" is implementing 5 investment projects for the construction of new, modernization and reconstruction of existing energy facilities. So:

- Under the project "Construction of a 220 kV electricity transmission line Takhiatashskaya TPP - Substation Khorezm - a settlement of Sarymay of the Khorezm region, tenders are conducted to sel ect a supplier for the purchase of equipment;

- on the projects "Expansion of the Navoi TPP with the construction of the second combined-cycle plant with a capacity of 450 MW" and "Construction of the Turakurgan thermal power plant in the Namangan region" according to the contract with the general contractor consortium of the companies Mitsubishi Corporation and Mitsubishi Hitachi Power Systems, Ltd. (Japan) in this year, it is planned to supply basic and auxiliary equipment. Excavation works on vertical planning and construction of excavations have been completed at the site;

- for the project "Construction of two combined-cycle plants with a capacity of 230-280 MW at Takhiatash TPP" in accordance with the contract with the general contractor of the consortium of companies Hyundai Engineering & Construction Co. Ltd "delivery of main and auxiliary equipment is planned from May of this year. Construction and installation works are being carried out on the construction site.

Decree of the President of the Republic of Uzbekistan dated from 26.11.2016. №. DP-2661 "On the Program for the Further Modernization and Renewal of Low-Voltage Electric Networks for the Period 2017-2021" provides for the modernization and reconstruction of low-voltage networks with a length of more than 34.0 thousand km and 6.9 thousand transformer points. In the current year, it is planned to commission 6,800 km and install 2129 TP.

For the 1st quarter of this year.reconstruction and modernization of electric networks with a length of 707.4 km and 339 TPs were installed.

The enterprises of JSC "Uzbekenergo" carry out work to improve the calculation of electrical energy. For the period expired since the introduction of the period, legal consumers have 246.4 thousand pieces of three-phase, 198.0 thousand single-phase, household consumers 48.5 thousand pieces of three-phase, 4953.2 thousand pieces of single-phase electronic metering devices energy.

In order to establish an open dialogue with the public and work with their appeals, as well as timely resolution of consumer problems arising fr om the supply of electricity by the Uzbekenergo joint-stock company, the "Dialogue with the People" Channel was launched, operating under the direct supervision of the Chairman of the Management Board of JSC "Uzbekenergo".

In order to implement the activities of the Road Map of the Fuel and Energy Complex in fulfilling the assignments specified in the Address of the President of the Republic of Uzbekistan, Sh. Mirziyoyev. OliyMajlis of the Republic of Uzbekistan on December 22, 2017, approved by the minutes of the meeting of the Presidium of the Cabinet of Ministers of January 3, 2018 №. 1, developed and approved the "Roadmap" for the implementation of instructions relating to the Company.

Approved by the Cabinet of Ministers of the consolidated target parameters for JSC "Uzbekenergo" provides for the creation of 136 new jobs, including in the implementation of investment projects - 56 and programs for the development of the industry - 80 jobs.

As part of the food program, work continued to increase the volume of agricultural production.

Personal cabinet

electricity consumers
  • Ease of payment for electricity
  • Informing SMS payments
  • Information SMS message
  • Controlling costs
Go to the cabinet
Click to listen highlighted text! Powered by GSpeech